25 November 2026
CLEANSPARK, INC.
CIK: 827876•2 Annual Reports•Latest: 2026-11-24
Disclaimer: AI-assisted summary of SEC Form 10-K filings. Not official company content and not investment, legal, accounting, or tax advice. See full disclaimer here.
10-K / November 24, 2026
Revenue:$576,534,000
Income:-$987,092,000
10-K / December 3, 2024
Revenue:$378,968,000
Income:-$145,777,000
10-K / November 24, 2026
CleanSpark, Inc.
Company profile
- U.S. data center developer focused on scalable, energy-efficient digital infrastructure across the United States.
- Independently owns, leases, and operates a portfolio of data centers and power assets.
- As of September 30, 2026, contracted power capacity was approximately 1,818 MW, with up to 300 additional MW undergoing an approval process in Texas, for a total development platform of up to about 2.1 GW.
- The company does not intend to mine, purchase, or hold crypto assets other than bitcoin in the foreseeable future.
- Since fiscal year 2026, results are reported in two segments: Bitcoin Mining and Data Center Infrastructure.
Reportable segments (fiscal 2026)
Bitcoin Mining
- Operations are driven by mining capacity and hashrate.
- Capacity and operational hashrate (as of Sept 30, 2026):
- Georgia: ~633 MW; operational hashrate 20.16 EH/s.
- Mississippi: ~63 MW; 2.96 EH/s.
- Tennessee: ~209 MW; 9.95 EH/s.
- Wyoming: ~110 MW; 2.95 EH/s.
- Total: contracted 1,015 MW and 36.02 EH/s operational hashrate.
- Infrastructure and operations:
- Wyoming mining sites use immersion cooling.
- Total mining locations: 31.
- Miners owned: ~335,168; in service: ~199,745 (remainder new, relocating, under repair, or ready for deployment).
- Miner age range: 1–70 months; average age ~26 months.
- Miner energy efficiency: 13.5–23.5 J/TH; average 14.8 J/TH.
- Production and treasury:
- Bitcoin mined in fiscal 2026: ~7,236 BTC (net of mining pool fees), down 7.9% from 7,857 BTC in 2025.
- Mined bitcoin are partially sold to fund operations and partially used to settle derivatives: in 2026, 1,532 BTC were sold and 6,068 BTC were transferred to settle derivatives.
- Bitcoin held in wallets controlled by the company with custody via Coinbase; approximately 98% in cold storage and ~2% in hot wallets (as of Sept 30, 2026).
- Revenue is recognized when bitcoin rewards are no longer constrained and the company can reasonably estimate rewards; revenue is not disaggregated between block rewards and fees.
- Customer/market characteristics:
- Foundry Digital, the mining pool operator, is the primary counterpart for mining payouts; the pool contract is terminable by either party.
- The company treats the mining pool as a customer because it pays for contributed hashing power.
Data Center Infrastructure
- Focused on development, hosting, and lease of AI and HPC data center capacity for hyperscalers, cloud providers, and AI/HPC customers.
- Revenue status: earned no revenue in fiscal 2026 or 2025.
- Sandersville, Georgia campus (Sandersville Lease):
- 20-year triple-net lease with two five-year extension options.
- Capacity under lease: 175 MW of critical IT load for a global technology tenant; tenant is responsible for all costs, including maintenance capex and future upgrades.
- Transition plan: management began planning to transition power capacity from bitcoin mining to data center use; full decommission of bitcoin mining at Sandersville is expected in fiscal year 2028.
- Texas expansion and development:
- October 2025: acquired ~271 acres in Austin County, TX with long-term power agreements totaling 285 MW for a new data center campus.
- February 2026: acquired ~447 acres in Brazoria County, TX with long-term power agreements totaling 300 MW, with potential for an additional 300 MW expansion.
- Combined Texas capacity: contracted 585 MW with potential for up to 300 MW more; these sites are intended to support future HPC/AI compute workloads.
- Development approach:
- Emphasis on access to power capacity, interconnection requirements, and complex infrastructure (transformers, switchgear, cooling, etc.).
- Uses the company’s portfolio of power assets to support scalable, energy-efficient facilities for hyperscale, AI, and HPC customers.
- Risks and considerations:
- Reliance on third parties for development, interconnection, and power supply.
- Risk of delays or increased costs and potential need for substantial capital to complete projects.
- Reliance on single or limited tenants for some leases.
- Market demand for AI/HPC data center capacity may affect outcomes.
Customers and tenancy
- Data Center Infrastructure: one global technology company tenant under the Sandersville Lease (as of Sept 30, 2026).
- Bitcoin Mining: mining rewards paid by a mining pool operator (Foundry Digital) under a contract that is cancellable by either party; the mining pool is the counterparty for revenue payouts.
Employees
- Total employees: 341 staff members (all located in the United States); 337 are full-time.
- Employees participate in equity incentive plans.
Financial highlights (selected)
- Revenue
- Data Center Infrastructure: no revenue in fiscal 2026 or 2025.
- Bitcoin Mining: revenue generated as bitcoin rewards and managed through bitcoin sales and treasury activities.
- Income and profitability
- Net loss from continuing operations for fiscal year 2026: $987,092 thousand (approximately $987.1 million).
- Cumulative net losses from inception through Sept 30, 2026: $1,142,986 thousand (approximately $1.143 billion).
- Bitcoin production and disposition (FY2026)
- BTC mined: 7,236 (net of pool fees).
- BTC sold: 1,532.
- BTC transferred to settle derivatives: 6,068.
- Bitcoin holdings and storage
- As of Sept 30, 2026: ~98% of bitcoins held in cold storage; ~2% in hot wallets.
- Bitcoin-related custody and financing
- The company participates in treasury activities and has engaged in bitcoin-linked derivative contracts; holdings are partially funded by financing facilities.
Debt and liquidity
- Convertible notes at parent level:
- 2030 Convertible Notes: $650,000 aggregate principal.
- 2032 Convertible Notes: $1,150,000 aggregate principal.
- Senior secured debt:
- 2031 Senior Secured Notes (issued by CSDC Finance): $2,276,000 aggregate principal.
- Completion guarantee under the Sandersville Facility: the company may fund CSDC Finance as needed to ensure timely completion if other funds are insufficient.
- Master loan facilities:
- Coinbase Master Loan: master line of credit up to $300 million. As of Sept 30, 2026: no borrowings outstanding and no bitcoin posted as collateral under this facility.
- Two Prime Master Loan: up to $100,000, amended in Aug 2026 to reduce interest and extend maturity; as of Sept 30, 2026: $90,000 outstanding; collateral includes 1,665 bitcoin with a fair value of $139,128.
Operational and governance notes
- The company maintains internal controls and compliance processes, including Sarbanes-Oxley Section 404 requirements.
- Governance includes internal committees (for example, an IT Steering and Risk Committee) responsible for cybersecurity and related risks.
Business model summary
- CleanSpark is transitioning from a primarily bitcoin mining focus to a two-segment model that includes Data Center Infrastructure for AI/HPC hosting and leasing alongside ongoing Bitcoin Mining operations.
- Data Center Infrastructure uses existing power assets and property development to provide scalable, energy-efficient compute capacity for hyperscalers, AI, and HPC customers, with multi-site growth in the U.S. (notably Georgia and Texas).
- Bitcoin Mining remains a core activity, providing mining capacity, BTC production, treasury management, and hedging/derivative activities while Data Center Infrastructure advances through development and initial tenant arrangements.
Notes
- All dollar amounts reflect the report’s convention of presenting figures in thousands unless otherwise indicated.
